Renovation Photos

Pictures from the renovation of the Activity Building.

Activity Building Renovations - July 24

The outside of the Activity Building as it is being remodeled. Here you can see work on the new wall between the parking lot and the sanctuary, some trench work for removing the old transformer, and a new air conditioner unit, waiting to be installed.

37 Photos

Activity Building tour - July 19

The activity building was open to the congregation for a tour on July 19th.

35 Photos

Activity Building Renovations - May 27

The renovations to the Activity building, May 27, 2009. At this point, the building has been completely abated and gutted, and new foundational, plumbing and electrical work has started.

32 Photos

Activity Building Renovations - June 3

More pictures of the Activity Building. More work on structural and mechanical systems. The sheer wall and new bathrooms are being put in, along with footings for new load-bearing pillars.

54 Photos

Activity Building Renovations - May 2009

Pictures of the inside of the Activity Building on May 6, 2009. At this point in construction, most of the work is asbestos abatement and removal of the old drywall, insulation, and tiling.

10 Photos

The old boiler room

The old boiler room of the Activity Building of Our Saviour's, before the renovations. April 26, 2009.

11 Photos